Category: Engineering
-

Design Review Checklist: 8 Checks From UX to Engineering
Use one design review checklist to assess UX, product, and engineering work against clear pass or fail criteria, decision gates, and sign off evidence.
-

Civil 3D Collaboration: File Locks and Faster Setup With a Partner
Set up Civil 3D collaboration with Forma Data Management, Desktop Connector, data shortcuts, file locks, template controls, cache checks, and partner support.
-

LOD in BIM: UK BEPs Link 100–500 to ISO 19650 Information Need
See what LOD 100 to 500 permits, why visual detail can mislead, and how UK BIM coordinators set and track requirements through BEPs, ISO 19650, and the CDE.
-

Embedded Engineer Model for UK Consultancies: CDM 2015 Comes First
Learn how UK consultancies can embed engineers, apply CDM 2015 and the IStructE Plan of Work, and onboard teams with an integration checklist.
-

BIM Coordination Outsourcing: 3 Models, UK BEP Checks, and a Pilot
Compare blended, embedded, and fully outsourced models, then align UK projects with ISO 19650, BEP, and CDE requirements before starting a Xponexus pilot.
-

Braced Frame Design in the UK: Eurocode Checks Start at the Brace
UK engineers can apply Eurocode capacity design to braced frames, check brace yielding and connections, and coordinate calculation, drawing, and BIM support.
-

5 Steps to Configure ISO 19650 Workflows: EIR to BEP to MIDP/TIDP
Stepwise practitioner focused guidance to configure EIR, BEP and MIDP/TIDP, set CDE metadata and status codes, and embed remote engineers for ISO 19650.
-

Appoint Early: BS 8102 Waterproofing for UK Design Teams (RIBA Stage 2)
BS 8102 waterproofing for UK design teams: agree the environmental grade, appoint a waterproofing specialist by RIBA Stage 2, and record design deliverables.
-

Procurement ready CAD drafting outsourcing for engineering teams
A procurement-ready checklist to brief a CAD drafting outsourcing pilot. For engineering teams: supplier selection, ISO 19650 and NCSC security checks,…
-

Avoid the EXC2 Default: UK Fabricators’ Steel Execution Class Checklist
Choose EXC1–EXC4 correctly: map Annex C to drawings, verify FPC and DoP, and follow a pre-fabrication checklist for UK fabricators and designers.
