Timber connection design is the part of a timber structure where most of the engineering effort goes. You choose a fastener or joint type, check it against the loads and the timber it sits in, and detail it so it can be made and erected without splitting the member. In the UK that means working to BS EN 1995-1-1 (Eurocode 5) and its National Annex, with the connection treated as a design element in its own right, never as a catalogue item.
This guide covers the joint types, the checks a reviewer expects to see, how glulam and glued-in rod connections differ, and the detailing points that cause problems on site.
TL;DR
- Connections can take up to 70% of the structural design effort in a timber building, so they deserve their own calculation package and drawing detail (Wood Solutions).
- In the UK, design to the first-generation BS EN 1995-1-1 and its National Annex now. The second-generation version exists, and the first is due to be withdrawn on 30 March 2028 (NBS).
- Check load transfer, fire, durability and appearance together, then check the timber left after holes and fastener spacing.
- Glued-in rods are not covered by the core Eurocode 5 provisions, so they need separate guidance and a documented basis.
- Overflow capacity is available if your team needs review-ready connection calculations and drawings quickly.
Table of Contents
- Why connections drive the design
- The main types of timber connection
- Four criteria before any calculation
- How Eurocode 5 checks a dowel-type joint
- Glulam connection design
- Which UK standards apply
- Fire, moisture and durability
- Detailing to avoid splitting and site problems
- What a review-ready connection package contains
- Perspective: where connection design goes wrong
- Extra capacity for timber connection calculations
- FAQ
- Sources
Why connections drive the design
A timber member is usually easy to size. The difficulty is getting force from one member into the next. Published guidance from Australia’s Wood Solutions puts connection design at up to 70% of the design effort on a structure, and the connection hardware at between 5% and 50% of the cost of the un-jointed timber members (Wood Solutions). The same source notes that joint design has a substantial effect on the economics of a building.
There is a safety reason as well. Research reviewed at Chalmers University describes joints as often the only source of ductility and energy dissipation in a timber structure, which is why brittle failure in tension or shear has to be addressed in the design (Chalmers). Timber members themselves fail in a brittle way. If the connection is the part that can yield, it has to be designed to do so, and the brittle modes have to be prevented from governing.
The main types of timber connection
Most joints in UK practice fall into a few families. The common way to think about them is by how they carry load.
| Connection type | How it carries load | Typical use |
|---|---|---|
| Nails, screws, staples | Dowel-type fasteners loaded laterally or in withdrawal | Stud walls, roof trusses, sheathing, rafter to plate |
| Bolts and steel dowels | Dowel-type fasteners in shear, often with steel plates | Glulam beam to column, heavy truss nodes |
| Punched, toothed and shear plates, split rings | Connectors that spread load over a bearing area | Trussed rafters, heavier site-made joints |
| Glued-in rods | Steel rods bonded into the timber, mostly end grain | Concealed, stiff moment joints, column bases |
| Carpentry joints | Direct contact and bearing | Traditional frames, repairs |
| Hybrid joints | Two categories combined, for example bonding plus steel plates | Joints needing stiffness and redundancy |
The hybrid category comes from academic work on connection analysis, which defines hybrid connections as combining two jointing categories, such as adhesive bonding with steel plates (Springer).
TRADA’s guidance on UK practice lists the dowel-type fasteners that Eurocode 5 covers (nails, staples, screws, bolts and steel dowels, designed using Johansen-based procedures) alongside connectors such as punched plates, toothed plates, shear plates and split rings (BM TRADA, Introduction to Eurocode 5). That same document does not cover glued-in rods in the core provisions it cites, which matters later in this guide.
Four criteria before any calculation
TRADA’s Wood Information Sheet on structural timber connections says designers must weigh four things when detailing a connection: load transfer, fire resistance, durability and visual appearance (TRADA). It also points to the strength of the remaining timber section after holes are drilled and fasteners are spaced.
In practice, we run through them in this order on a project:
- Load transfer. What are the load cases, load duration classes and directions relative to the grain? Does the joint carry shear only, or moment and axial force too?
- Fire. Is the connection exposed, protected by cover, or concealed within the section? Steel plates conducting heat into timber is the usual concern.
- Durability. Which service class applies, and what corrosion protection does the fastener need for that exposure?
- Appearance. Is the joint on show? Architects often want concealed fixings, which pushes the design toward slotted-in plates or glued-in rods.
Getting the fourth criterion settled early avoids redesign. A joint that is perfect structurally but unacceptable to the architect comes back at the worst moment.
How Eurocode 5 checks a dowel-type joint
The backbone of Eurocode 5 for nails, screws, bolts and dowels is the European Yield Model. Chalmers’ review describes it as the method used to estimate the load-carrying capacity of a connection from the embedment strength of the timber and the yield moment of the fastener (Chalmers). Each fastener can fail in a set of modes: timber crushing under the fastener, one or two plastic hinges forming in the fastener, or a combination.
For a typical lateral-load check, the calculation covers:
- characteristic embedment strength of each timber member, which depends on density, fastener diameter and angle to grain
- characteristic yield moment of the fastener
- the governing failure mode, taken as the lowest of the Johansen modes
- the contribution of the rope effect where the code allows it
- the effective number of fasteners in a row parallel to the grain
- modification factors for load duration and service class, and the partial factor for connections
The roymech summary of Eurocode 5 lists the same drivers: embedment strength, fastener diameter, spacing and edge distances, load direction relative to grain, moisture content, density, service class and load duration (Roymech). Treat such summaries as a prompt for your own checklist, not a substitute for the code itself.
The effective number of fasteners
A row of fasteners parallel to the grain does not behave as the sum of its parts. Wood Solutions highlights that the effective number of fasteners and the spacing requirements are there to prevent brittle failure modes (Wood Solutions). Eurocode 5 handles this by reducing the number of fasteners counted in a row for dowel-type fasteners. Adding more bolts to a joint does not give proportional capacity, and sometimes makes it worse by creating a splitting plane.
Checks beyond the fastener
The fastener capacity is only one line of the calculation. A reviewer will also look for:
- block shear or plug shear failure around a group of fasteners
- splitting caused by a load component perpendicular to the grain, such as an inclined fastener load near a member edge
- net section tension in the timber after drilling and slotting
- steel plate checks: tension, bearing, and buckling where the plate is slender
- slip and stiffness, where the joint stiffness changes the frame analysis or serviceability deflections
- the fire-resistance period, using the reduced section or protected connection assumptions
This is the list that was thin in the research behind this guide, so use it as a working checklist, and cross-check it against the clauses of BS EN 1995-1-1 and the relevant TRADA guidance for the specific joint type.
Glulam connection design
Glulam beams and columns are usually connected with steel plates and dowels or bolts, with slotted-in plates for a concealed look. The design principles are the same Eurocode 5 checks, with a few points that deserve extra attention in large sections: the effect of shrinkage and swelling across deep members, splitting at the connection where tension perpendicular to the grain develops, and the brittle block shear mode in thick members.

Where the architect wants hidden joints and high stiffness, glued-in rods come into play.
Glued-in rods
The Institution of Structural Engineers explains that glued-in rods differ from bolts and dowels because they are commonly bonded into timber end grain. That makes concealed, stiff connections possible, with high force and moment capacity and minimal slip, and correctly detailed joints can also achieve fire protection (IStructE). The same article records UK use going back to the 1970s, and notes rods are also used to reinforce timber perpendicular to the grain where bearing or splitting is critical, such as the apex of curved arches and areas near notches, and to repair damaged historic timber.
The design basis needs care. EOTA Technical Report TR 070 covers glued-in rods in glulam, glued solid timber, CLT and LVL, using assessed two-component epoxy or polyurethane adhesives. It excludes ordinary on-site gluing except under factory-like conditions, and it applies to predominantly static or quasi-static load-bearing structures in service classes 1 and 2, with long-term temperatures no higher than 60 °C (EOTA).
For rods loaded parallel to their axis, the same report requires separate checks for:
- failure of the steel rod
- failure of the bond line or the wood-adhesive interface
- failure of the wood adherent
- block shear failure of a group of rods
Multiple rods must also be checked for uneven load sharing, and minimum rod and edge distances apply (EOTA). Because the core Eurocode 5 provisions cited by TRADA do not cover glued-in rods, record in the calculations which guidance you relied on, and who is responsible for the adhesive system and the quality control of the bonding.
Which UK standards apply
The position on standards is simple but changing:
- BS EN 1995-1-1 with the UK National Annex is the applicable standard for timber design now. The second-generation BS EN 1995-1-1:2025 has been published and can be used to prepare for the transition. The first generation is due to be withdrawn on 30 March 2028, and the National Annex holds the UK national choices (NBS).
- Supporting guidance from TRADA and IStructE fills in practical detailing, and EOTA TR 070 is the reference for glued-in rods.
- Warranty requirements can add a layer. A Barnsley planning submission, for example, requires timber roof structures to be designed in accordance with NHBC Technical Requirement R5 Structural Design (Barnsley Council planning file).
BSI’s overview of the second-generation Eurocodes says they aim to improve clarity and usability, with updated rules for specialist scenarios reducing the need for bespoke justification, and that they place more emphasis on reuse and adaptation of existing structures (BSI Knowledge). For a long-running project, state on the calculation cover sheet which edition and National Annex you used, so the reviewer is not guessing.
Fire, moisture and durability
Fire and durability are not afterthoughts in connection design. They change the joint.
On fire, a UK government report on property protection warns that internal voids and cavities in modular construction can act as pathways for fire spread (GOV.UK). The same report says the sustainability agenda in construction can conflict with fire safety and resilience. For connections, this means looking at whether a slot, drilled hole or concealed plate creates a cavity, and how it is sealed or protected.
On moisture, check the service class for each connection rather than for the building as a whole. A beam end bearing on a masonry wall may sit in a damper microclimate than the beam middle. Choose fastener coatings or stainless steel to suit, and keep end grain from trapping water.
On material records, the timber and any adhesive often need documentation such as environmental product declarations and chain-of-custody certificates when the client is chasing sustainability targets. Guidance on specifying sustainable wood with EPD and low-VOC documentation shows the kind of certification evidence worth requesting for the timber you specify.
Detailing to avoid splitting and site problems
Wood Solutions advises that detailing should observe fastener edge, end and spacing requirements to reduce splitting (Wood Solutions). The values themselves come from Eurocode 5 for your fastener type. Beyond those minimums, the points we look for before a drawing is issued:
- Staggered fastener rows where a single line of fasteners would create a splitting plane.
- Fastener positions clear of knots and the pith, which the carpenter can only control if the drawing says so.
- Tolerances for drilling, particularly with steel plates and dowels, where oversized holes introduce slip the analysis did not allow for.
- Order of assembly, so the joint can be put together on site without forcing members.
- Slot depths and plate cover shown to the dimension the fire design assumed.
- Marking of every connection so that each one can be traced back to a calculation.
This connects to your general drawing checks. Our structural drawing checklist for UK projects covers what to confirm before issue, and seven Eurocode-aligned deliverables for timber structure design lists what a complete package contains.
What a review-ready connection package contains
A reviewer, checker or building control body should be able to follow the logic without phoning the designer. We aim for:
- a design basis page: standards and editions, National Annex, service classes, load duration, fire period, material grades
- a load schedule showing the actions at each connection, with the combination that governs
- one calculation per connection type, with the governing failure mode stated
- a summary table listing every connection mark, fastener, number, spacing, utilisation
- drawings with the same marks and the same dimensions
- notes on corrosion protection, adhesive systems, tolerances and inspection
Where a roof has substituted timber sections or grades, the connections need re-checking too. A project like our timber truss material substitution review shows why: a different density or section changes embedment strength and edge distances, so the nodes cannot be assumed to still work.
Perspective: where connection design goes wrong
We see the same pattern on overflow timber work. The members are sized, the architect has agreed the layout, and the connections are left as “proprietary hanger to suit” or “bolted connection by others”. Then the contractor asks what size the bolts are, and the answer has to be produced at speed under programme pressure.
Our view is that connections should be designed at the same time as the members, not after them. A joint that cannot be made, or that splits the member it joins, will send you back to change the section, and the saving from sizing the member tightly is gone. We would rather check the connection first and size the member to suit it.

We also think the second-generation Eurocodes are a reason to be explicit, not to wait. Writing the edition and National Annex on the calculation cover costs nothing and saves a reviewer’s question later. Where the code is silent, as it is on glued-in rods in its core provisions, say what you used instead.
The other lesson is organisational. Connection checks are repetitive, detailed and time-consuming, which is exactly the work that gets squeezed when a team is busy. Embedding an engineer who works to UK standards in your workflow is a sensible way to protect that checking time without hiring permanently.
— Mohammed
Extra capacity for timber connection calculations
If your team is stretched, Xponexus Engineering provides remote civil and structural engineers who work inside your process: calculations, technical drawings and BIM coordination aligned to UK standards and Eurocodes, with NDA protection and project kick-off within 48 hours. You keep the client relationship, and we deliver outputs ready for your review. See our remote engineering support or our structural engineering services, and look at an example in structural calculation support for a UK consultancy.

FAQ
Which standard do I use for timber joint design in the UK?
Use BS EN 1995-1-1 (Eurocode 5) with the UK National Annex. The second-generation BS EN 1995-1-1:2025 is available for preparing for the transition, and the first generation is due to be withdrawn on 30 March 2028 (NBS). State the edition on your calculations.
Can I design glulam connections with Eurocode 5 alone?
For dowels, bolts, screws and connector plates, yes, using the Eurocode 5 procedures. Glued-in rods are not covered by the core provisions TRADA cites, so use dedicated guidance such as EOTA TR 070 and document the basis (EOTA).
Why do timber connections fail suddenly?
Because several modes are brittle, such as splitting, block shear and tension perpendicular to the grain. Joints are often the only source of ductility in a timber structure, so the design has to make the ductile mode govern and prevent the brittle ones (Chalmers).
How much of the design effort goes on connections?
Up to 70% on some structures, according to Wood Solutions, and connection hardware can be 5% to 50% of the cost of the un-jointed timber members (Wood Solutions). It is worth planning for.
Can outsourced engineers produce timber connection calculations?
Yes, provided they work to your standards and the checking route is clear. We deliver review-ready calculation packages to UK standards and Eurocodes, which your own chartered engineer then reviews and signs off.
Sources
- IStructE: Timber Engineering Notebook No. 14, special connections
- TRADA: Design of structural timber connections
- Chalmers: Designing timber connections for ductility
- EOTA: Design of glued-in rods for timber connections, TR 070
- Wood Solutions: Timber connectors
- NBS: BS EN 1995-1-1:2025
- BM TRADA: Introduction to Eurocode 5
- BSI Knowledge: Eurocodes
- GOV.UK: Fire safety, property protection final report
- Springer: Connections design and analysis
- Roymech: Timber connections design
- Barnsley Council planning file


Leave a Reply